1: SAUDI KAYAN PETRO-CHEMICAL COMPLEX (LDPE) @ JUABIL
Contractor: Bumyang Air Conditioning Plant Co., Ltd. Value: SR.450,000.00
Period: 04 (Four) Months. Complete % :
: ON-GOING

[The Building name is : IBC STATION BLDG.; COLD STORAGE BLDG. ]


2: SAUDI KAYAN PETRO-CHEMICAL COMPLEX (AMINES) @ JUABIL
Contractor: CTCI ARABIA LTD. Value: SR.1,050,000.00
Period: Four (04) Months. Complete % :
: ON-GOING

[The Building name is : DRUM FILLING STORAGE HOUSE BLDG.]


3: SAUDI KAYAN PETRO-CHEMICAL COMPLEX (AMINES) @ JUABIL
Contractor: Saudi Binladin Group-PCM Div. Value: SR.1,273,779.00
Period: Four (04) Months. Complete % :
: ON-GOING

[The Building name is : PHU OFFICE BLDG.]


4: MAADEN PHOSPHATE @ RAS AZZOUR [HVAC & DDC CONTROL SYSTEM]
Contractor: Mohammad Al Mojil Group Value: SR. 2,200,000.00
Period: 04 (Four) Months. Complete % :
: 100%

[The Building name is : MH1 SUBSTATION BLDG. ]


5: PRINCESS NOURA UNIVERSITY FOR WOMEN (PNUW) @ RIYADH [HVAC System]
Contractor: ELSEIF-CCC JOINT VENTURE Value: SR. 2,925,000.00
Period: Four (04) Months. Complete % :
: 95% Completed

[The Building names are : Plant Nursery Building; Married Senior Staff Housing; 03 Nos. Service Gates; 08 Nos. Electrical Culvert; 06 Nos. Electrical Distributor] 


6: AL BILAD MOSQUE @ JUBAIL, K.S.A. [HVAC & DDC CONTROL SYSTEM]
Contractor: ENTERPRISE FOR PROCUREMENT &CONSTRUCTION (ENPAC) Value: SR.450,000.00
Period: 04 (Four) Months. Complete % :
: 100% Completed

    


7: Royal Commission Fuel & Feed Stock @ Jubail [HVAC System]
Contractor: Saudi Binladin Group-PCM Div. Value: SR. 318,062.00
Period: 2 (Two) Months. Complete % :
: 100% Completed

[The Building Names are : Control Building; Analyzer Building]


8: NCP PETRO-CHEMICAL COMPLEX [Control Building] @ JUABIL [HVAC System]
Contractor: ZAMIL AIR CONDITIONERS Value: SR. 324,000.00
Period: 2 (Two) Months Complete % :
: 100%

   


9: SAUDI KAYAN PETRO-CHEMICAL COMPLEX (PP & PH) @ JUABIL [HVAC & DDC CONTROL SYSTEM]
Contractor: SAMSUNG Saudi Arabia Ltd. (SSAL) Value: SR.850,000.00
Period: 03 (Three) Months. Complete % :
: Completed

[The Building names are : Substation #27; Operator Shelter; Extruder Building;

Product Storage Silo Structure; DC/AD/GO Storage Bldg.; Peroxide Storage Bldg.]


10: SAUDI KAYAN PETRO-CHEMICAL COMPLEX - K038 (Jubail) [HVAC & DDC CONTROL SYSTEM]
Contractor: Mohammad Al Mojil Group Value: SR. 230,000.00
Period: 02 (Two) Months. Complete % :
: 100%

[The Building name is : Metering Station ]


11: SAUDI KAYAN PETRO-CHEMICAL COMPLEX - K038 (Juaymah) [HVAC & DDC CONTROL SYSTEM]
Contractor: Mohammad Al Mojil Group Value: SR. 450,000.00
Period: 03 (Three) Months. Complete % :
: 100%

[The Building name is : Substation #13]


12: NCP PETRO-CHEMICAL COMPLEX [NCP GIS Building] @ JUABIL [HVAC System]
Contractor: ZAMIL AIR CONDITIONERS Value: SR. 136,000.00
Period: 2 (Two) Months Complete % :
: 100%

   


13: NCP PETRO-CHEMICAL COMPLEX [NCP GIS Building] @ JUABIL [HVAC System, DDC Control System]
Contractor: Consolidated Contractors Co. W.L.L. Value: SR.950,000.00
Period: 3 (Three) Months. Complete % :
: 100%

      


14: AL BILAD PROPOSED COMMERCIAL CENTER AND CLINIC @ JUBAIL, K.S.A. [HVAC & DDC CONTROL SYSTEM]
Contractor: ENTERPRISE FOR PROCUREMENT &CONSTRUCTION (ENPAC) Value: SR. 1,950,000.00
Period: 4 (Four) Months. Complete % :
: 100%

[The Building name is : Commercial Center, Clinic Building]


15: APS ADMIN. OFFICE BUILDING @ DAMMAM [HVAC Chilled Water System, BMS/DDC Control System]
Contractor: Advanced Fiber Glass Pipe Systems (APS) Value: SR. 1,798,395.00
Period: SR. 1,798,395.00 Complete % :
: 100%

      


16: SALES GAS MEETERING SHELTER TO AR-RAZI IV (AR-RAZI METHANOL @ JUBAI) [HVAC & DDC CONTROL SYSTEM]
Contractor: AL-YUSR TOWNSEND & BOTTUM Co. Ltd. (AYTB) Value: SR. 359,000.00
Period: 03 (Three) Months Complete % :
: 100%

[The Building name is : Bagging Office Building]


17: EASTERN PETRO-CHEMICAL CO. (SHARQ) @ JUBAIL (SHARQ 3RD EXPANSION PE PLANT) [HVAC & DDC CONTROL SYSTEM]
Contractor: Saudi BinLadin Group-PCM Div. Value: SR. 2,938,409.00
Period: 4 (Four) Months. Complete % :
: 100%

[The Building name is : Bagging Office Building]


18: EASTERN PETRO-CHEMICAL CO. (SHARQ) @ JUBAIL (SHARQ 3RD EXPANSION PE PLANT) [HVAC, CHILLEDWATER SYSTEM & DDC CONTROL SYSTEM]
Contractor: LINARCO Co. Ltd. (LINDE Arabian Contractors) Value: SR. 19,344,550.50
Period: 12 (Twelve) Months. Complete % :
: 100%

[The Buildings names are : Finishing Structure, Bagging/Palleting,

Silica Storage, Additive Storage Building]


19: Complex Hawiyah NGL – Recovery Plant [HVAC WORKS-'CHW SYSTEM & DIRECT EXPANSION, DDC CONTROL SYSTEM]
Contractor: MODERN ARAB CONSTRUCTION Co. LTD. Value: SR. 4,450,000.00
Period: 8 (Eight) Months. Complete % :
: 100%

[The Buildings names are : Administration Bldg. (200); Musalla Core Area (202);

Material Storage (203); Security Shift Supv. (205); Plant Gate HouseWH (206);

Computer Gate House (208); Security X-Ray Bldg. (209); Maintenance Shop

Bldg. (500); Fabrication Shop Bldg. (501); Musalla Bldg. (504); Sand Blasting

& Storage Bldg. (505); PZV Shop Bldg. (509)].


20: LINEAR ALPHA OLEFINS (LAO) PROJECT @ JUBAIL [HVAC & HVAC RELATED ELECTRICAL WORKS CHILLEDWATER
Contractor: SAUDI BIN LADIN GROUP (PCM DIV.) Value: SR. 5,073,597.00
Period: 8 (Eight) Months. Complete % :
: 100%

   


21: RECEIVING, SHIPPING & SUN SHELTER @ YANBU REFINERY (Saudi Aramco Contract # 6600011148; J.O. No. 19-03510-0012) [ COMPLETE ELECTRO-MECHANICAL SYSTEM/WORKS]
Contractor: AL-LATIFIA TRADING &CONTRACTING Value: SR. 990,000.00
Period: 06 (Six) Months. Complete % :
: 100%

A. HVAC SYSTEM / WORKS

B. PLUMBING SYSTEM/WORKS

1. Plumbing Fixtures

2. Sewerage/Drainage Piping (RTR & PVC) Works.

C. FIRE PROTECTION SYSTEM/WORKS

D. ELECTRICAL SYSTEM/WORKS (HV/LV)

- Switch Board / Panel Board.

- Wiring Devices, Lighting Fixtures.

- Low Current System (Fire Alarm, Telecommunication System)

- Cables / Wiring.

E. HVAC CONTROL (DDC) SYSTEM/WORKS


22: INSPECTION BUILDING REPLACEMENT @ RASTANURA RASTNURA REFINERY. (Saudi Aramco Contract # 6600007973 Saudi Aramco BI -10-03571) [HVACWORKS]
Contractor: APTC CONTRACTING Co. LTD. Value: SR. 1,186,950.00
Period: 06 (Six) Months. Complete % :
: 100%

     


23: P&C JUBAIL INDUSTRIAL COLLEGE EXPANSION R.C. CONTRACT No. 098-C20 [HVACWORKS-CHILLEDWATER SYSTEM]
Contractor: SHADE CORPORATION LTD. Value: SR. 5,800,000.00
Period: 18 (Eigtheen) Months. Complete % :
: 100%

   


24: NEW 1000 MAN MOSQUE JU-44 KING FAHD NAVAL ACADEMY / JUBAIL PLUMBING AND ELECTRICAL WORKS
Contractor: MUDAIFER TECHNICAL SERVICES Value: SR. 71,000.00
Period: 3 (Three) Months Complete % :
: 100%

    


25: SULFUR RECOVERY UNIT @ RIYADH REFINERY / RIYADH TEMPORARY A/C SYSTEM FOR STRIPPER COLUMNS
Contractor: MODERN ARAB CONSTRUCTION Co. LTD. Value: SR. 151,000.00
Period: 1 (One) Week Complete % :
: 100%

    


26: METERING SHELTER GAS SUPPLY TO JUPC UNITED OLEFINS COMPLEX PROJECT [HVACWORKS]
Contractor: SAUDI BINLADIN GROUP Value: SR. 80,910.00
Period: 1 (One) Month Complete % :
: 100%

       


27: ROYAL COMMISSION SCHOOLS / JUBAIL R.C. CONTRACT No. 623-C08 (ONE BOYS INTERMEDIATE) [HVACWORKS]
Contractor: Jufal Naif Obaid Al-Shammari Trading & Contracting Co. (JNCO) Value: SR. 680,000.00
Period: 6 (Six) Months Complete % :
: 100%

     


28: ROYAL COMMISSION SCHOOLS / JUBAIL R.C. CONTRACT No. 627-C11 (ONE GIRLS SECONDARY) [HVACWORKS]
Contractor: APTC CONTRACTING Co. LTD. Value: SR. 1,119,512.00
Period: 6 (Six) Months Complete % :
: 100%

    


29: SULFUR RECOVERY UNIT @ RIYADH REFINERY / RIYADH SAUDI ARAMCO JOB ORDER No. 35260 [HVAC (A/C EQUIPMENTS, HVAC CONTROLS) WORKS]
Contractor: MODERN ARAB CONSTRUCTION Co. LTD. Value: SR. 982,237.00
Period: 6 ( Six) Months Complete % :
: 100%

   


30: ROYAL COMMISSION SCHOOLS / JUBAIL R.C. CONTRACT No. 627-C10R (ONE BOYS & ONE GIRLS ELEMENTARY) [HVACWORKS]
Contractor: APTC CONTRACTING Co. LTD. Value: SR. 1,405,186.00
Period: 8 (Eight) Months Complete % : September 2003
: 100%

  


31: MAINTAIN GAS COMPRESSION CAPACITY/ABQAIQ PLANTS SAUDI ARAMCO CONTRACT No. 44576/00 [ELECTRO-MECHANICAL (HVAC EQUIPMENTS, HVAC CONTROLS) WORKS]
Contractor: MODERN ARAB CONSTRUCTION Co. LTD. Value: SR. 778,805.00
Period: 6 ( Six) Months Complete % : August 2003.
: 100%

   


32: SABG SCHOOLS / Saudi Aramco / Hofuf One Boys & One Girls Elementary School (Saudi Aramco Contrct # 44571/00)
Contractor: AL-LATIFIA TRADING &CONTRACTING Value: SR. 11,325,000.00
Period: 12 ( Twelve Months ) Complete % : February 2003.
: 100%

[ COMPLETE ELECTRO-MECHANICAL SYSTEM/WORKS]

A. HVAC SYSTEM / WORKS

Chilled Water System Capacity : 525 Tons

B. PLUMBING SYSTEM/WORKS

1. Drinking Water Chillers.

2. Reverse Osmosis Plant.

3. Drinking (Hot & Cold) Water/Raw Water Piping Works.

4. Plumbing Fixtures

5. Sewerage/Drainage Piping (RTR & PVC) Works.

C. FIRE PROTECTION SYSTEM/WORKS

D. ELECTRICAL SYSTEM/WORKS (HV/LV)

- Switch Board / Panel Board.

- Wiring Devices, Lighting Fixtures.

- Low Current System (Fire Alarm, Telephone, Music & Audio Sound,

Paging, Master Clock).

- Cables / Wiring.

E. HVAC CONTROL & BMS SYSTEM/WORKS


33: VIP GUEST VILLAS / Royal Commission / Jubail [ELECTRO-MECHANICAL (HVAC EQUIPMENTS, HVAC (HONEYWELL) CONTROLS)]
Contractor: ENTERPRISE FOR PROCUREMENT AND CONSTRUCTION ( ENPAC ) Value: SR. 2,219,269.00
Period: 12 ( Twelve Months )12 ( Twelve Months ) Complete % : December 20, 2001
: 100%

       


34: SAUDI EUROPEAN PETROCHEMICAL Co. IBN ZAHR PP - II PROJECT / JUBAIL. ELECTRO-MECHANICAL WORKS [HVAC, PLUMBING, FIRE PROTECTION]
Contractor: SAUDI BIN LADIN GROUP (PCM DIV.) Value: SR. 1,799,482.81
Period: Nine (09) months Complete % : September 13, 2000
: 100%

This plant is a member of SABIC group of companies. Our work is the

complete supply of building Elecro- Mechanical system (ie., HVAC,

PROTECTION, PLUMBING and ELECTRICAL). This plant is located

in a very hazardous and classified location. Shipping Office Building, Lab.

Bldg., Substation Bldgs. are classified as 'blast-resistant' building. Buildings

and other areas of our work (i.e., Pelleting areas, Peroxide building,

OTHER PROJECTS

Cycle Gas Compressor buildings, reactor vessel area, Teal bunker area are

Propylene located in hazardous environment. This work has been

subcontracted from Saudi Bin Laden Group (PCM DIV). under the

management of Parsons International.


35: BERRI GAS PLANT PROJECT / JUBAIL [ HVAC EQUIPMENTS, ELECTRO-MECHANICAL, EXPLOSION PROOF CONDUITING, WIRING CONTROL SYSTEMS, START-UP COMMISSIONING AND HVAC (STAEFA) CONTROLS]
Contractor: Mohammad Al Mojil Group Value: SR. 848,352.00
Period: 4 ( Four Months ) Complete % : January 22, 2000
: 100%

This plant is a 'gas-producing plant' and a restricted area. Most of the

buildings are located in classified and hazardous areas. The work has been

subscontracted from Mohammed AlMojil Group under JGC Arabia and

Saudi Aramco. Our work is the supply and installation of complete HVAC

system for Substation-6 and Substation-13.


36: Nama Epoxy Resin Project / Jubail -Electro-MechanicalWorks / HVAC System (Design & Build), Conduiting, Wiring and Power HVAC Control System.
Contractor: Mitsui Engineering &Shipbuilding Arabia Ltd.(MESAR) Value: SR. 2,175,000.00
Period: 05 (Five) months. Complete % : January 07, 1999
: 100%

This plant is located in hazardous and classified location. This plant is a

member of the SABIC Group of companies. The work has been subcontracted

from Mitsui Engineering and Shipbuilding Arabia Ltd. (MESAR) Japan. Our

scope of work is the complete supply and installation of HVAC system, HVAC

Automatic Control System of a Five (5) storied building.

OTHER PROJECTS

The System comprised of Chilled water system, Inertial filter, Steam Humidifier,

Bleed Fan Exhaust Fan, Electrical Pull Box and Electric Heater.


37: Shaybah Pipe Line Terminal Facilities/Rastanura, IFB - SPT - 003/004 Electro-MechanicalWorks / HVAC System (Design & Build), Conduiting, Wiring and Power HVAC Control System (SAUDI ARAMCO CONTRACT NO. 44101/00
Contractor: Mohammad AlMojil Group. Value: SR. 735,800.00
Period: 08 (Eight) months Complete % : May 15, 1998
: 100%

The System comprised of 80 tons DX Coil System and Electrical Heater. 


38: Al Qassim Product Supply System / Al Qassim (Supply and Installation / Duct Works).
Contractor: Mohammad AlMojil Group. Value: SR. 205,000.00
Period: 06 (Six) months Complete % : January 10, 1998
: 100%

    


39: Saudi Methanol Plant / AR RAZI - III / Jubail Electro-MechanicalWorks / HVAC System(Design & Build), Conduiting, Wiring and Power HVAC Control System.
Contractor: Mohammad AlMojil Group. Value: SR. 2,796,060.00
Period: 12 (Twelve) months Complete % : September 15, 1998
: 100%

This plant is a 'methanol-producing plant' and a member of SABIC

group of companies. Most of the buildings are located in classified

and hazardous areas. Our work is the supply and installation of

complete HVAC system for building such as Central Control Room,

Central / Local Substation, and offices. Central Control Room and

Central Substation housing delicate equipment's serving the plant is

blast-resistant' type building where blast valves are applied. The work

has been subcontracted from Mohammed AlMojil Group.

 

* Centeral Control Room

* Central Substation

* Local Substation

5 projects

OTHER PROJECTS

* G.I.S. Substation

* Engineering Office

* Maintenance Office Building

* HVAC Control/Starter Panel

* Warehouse Building

* Maintenance Shop Building

The System comprised of 160 Tons DX Coil System, Bleed fan, Exhaust fan,

Inertial Filter, Blast valves and Humidifier.


40: Royal Commission Contract No. 622-C02, 622-C02A, 623-C05B, 624-C03,632-C04 and 632-C05. At Mahallat Al-Ferdose, Al Najd, Al-Farouk and and Al Faiha / Jubail.
Contractor: A. A. M. Al-Khodari Sons Co. Value: SR. 10,950,000.00
Period: 08 (Eight ) months (each school) Complete % : July 10, 1998
: 100%

Sl No. Buildings

1 : Boy's School

2 : Girl's School

4 projects

OTHER PROJECTS

3 : Boy's School

4 : Boy's School

5 : Girl's School

6 : Boy's School

7 : Girl's School

8 : Girl's School

The HVAC System and Control of 2547 Tons Comprises of :-

- 265 Tons Girl's School - Package Roof Top A/C Units (Al-Ferdos).

- 260 Tons Boy's School - Package Roof Top A/C Units (Al-Ferdos).

- 291 Tons Boy's School - Package Roof Top A/C Units (Al-Najd).

- 276 Tons Boy's School - Package Roof Top A/C Units (Al-Farouk).

- 276 Tons Girl's School - Package Roof Top A/C Units (Al-Najd).

- 389 Tons Boy's School - Package Roof Top A/C Units (Al-Farouk).

- 389 Tons Girl's School - Package Roof Top A/C Units (Al-Najd).

- 389 Tons Girl's School - Package Roof Top A/C Units (Al-Faiha).

- 12 Tons Window A/C Units for Girl's and Boy's Schools.


41: Saudi Aramco Contract No. 37814/00 General Office Complex & Associated Buildings / Dhahran.
Contractor: Al-Khodari & Sons Co. Value: SR. 6,990,000.00
Period: TenMonths Complete % : June 07, 1995
: 100%

 

June 07, 1995


42: Saudi Aramco Contract No. 63011/00 Residential & Industrial Complex (RIC) Building Al-Hawtah
Contractor: MAC Value: SR. 7,125,000.00
Period: 12 months Complete % : July 10, 1994
: 100%

EPC full Electro-Mechanical Works / HVAC System (Design & Build),

Conduiting, Wiring and Power HVAC Control Systems inside buildings

for 41 buildings as per list.

 


43: Saudi European Petrochemical Co. (IBN ZAHIR), MTBE II Plant
Contractor: MAC / Snamprogetti Value: SR. 4,370,000.00
Period: 08 Months Complete % : March 10, 1993
: 100%

This plant is located in hazardous and classified location. This plant is a

member of the SABIC Group of companies. The work has been subcontracted

from Modern Arab Construction and Snamprogetti. Our scope of work is the

complete supply of HVAC system of three Substations buildings, Laboratory

building, Satellite and Technical Building. All the above buildings are housing

delicate equipment's serving the plant.

E. P. C Full Electro-Mechanical Works / HVAC System, Conduiting, Wiring and

Power HVAC Control Systems for Six Buildings

1. Substation # 0

2. Substation # 6

3. Substation # 4

4. Laboratory Bldg. / Processed Chilled Water System.

5. Satellite Building

6. Technical Building

The System Comprised of :

- 370 tons DX Coil System, consisting of 08 Nos. Packages including pressurization Units for

each system and inertial filter with bleed fan. Also included was the control system to work stand

by units.


44: Al Qassim Product Supply System / Al Qassim.
Contractor: Mohd. Al Mojil Group Value: SR. 205,000.00
Period: 06 Months Complete % : 100%
: 100%

(Supply & Installation / Duct Works) 


45: SABG SCHOOLS / Saudi Aramco / Hofuf
Contractor: Al-Latifia Trading & Contracting Value: SR. 11,325,000.00
Period: 12 Months Complete % : 100%
: 100%

[HVAC and electro-mechanical works]


46: NEW 1000 MAN MOSQUE JU-44 KING FAHD NAVAL ACADEMY / JUBAIL JU-44 KING FAHD NAVAL ACADEMY / JUBAIL
Contractor: Mudaifer Technical Services Value: SR. 57,000.00
Period: 03 Months Complete % :
: 100%

[Plumbing and Electrical works]


47: ROYAL COMMISSION SCHOOLS / JUBAIL R.C. CONTRACT No. 623-C08 / (ONE BOYS INTERMEDIATE)
Contractor: Jufal Naif Obaid Al-Shammari Trading & Contracting Co. (JNCO) Value: SR. 680,000.00
Period: 06 Months Complete % :
: 100%

[HVAC works]


48: ROYAL COMMISSION SCHOOLS / JUBAIL R.C. CONTRACT No. 627-C11 / (ONE GIRLS SECONDARY)
Contractor: APTC Contracting Co. Ltd. Value: SR. 1,119,512.00
Period: 06 Months Complete % :
: 100%

[HVAC works]


49: ROYAL COMMISSION SCHOOLS / JUBAILR.C. CONTRACT No. 627-C10R / (ONE BOYS & ONE GIRLS ELEMENTARY)
Contractor: APTC Contracting Co. Ltd. Value: SR. 1,405,186.00
Period: 08 Months Complete % :
: 100%

[HVAC works]


50: MAINTAIN GAS COMPRESSION CAPACITY/ABQAIQ PLANTSSAUDI ARAMCO CONTRACT No. 44576/00
Contractor: Modern Arab Construction Co. Ltd. Value: SR. 778,805.00
Period: 06 Months Complete % :
: 100%

[HVAC and electro-mechanical works]


51: Saudi European Petrochemical Co. IBN Zahr PP - II Project / Jubail.
Contractor: Saudi Bin Ladin Group / PCM Division Value: SR. 1,779,482.81
Period: 09 Months Complete % : 100%
: 100%

[HVAC and electro-mechanical works]


52: Berri Gas Plant Project / Jubail.
Contractor: Mohd. Al Mojil Group Value: SR. 848,352.00
Period: 04 Months Complete % : 100%
: 100%

[HVAC equipment, electro-mechanical, explosion proof conduiting, wiring control systems, start-up commissioning and HVAC (STAEFA) controls]


53: Nama Epoxy Resin Project / Jubail
Contractor: Mitsui Engineering & Ship Building Co. Value: SR. 2,175,000.00
Period: 05 Months Complete % : 100%
: 100%

The System comprised of Chilled water system, Inertial filter, Steam Humidifier, Bleed Fan Exhaust fan, Electrical pull box and Electrical heater.


54: Shaybah Pipe Line Terminal Facilities/Rastanura, IFB - SPT - 003/004Electro-Mechanical Works / HVAC System (Design & Build), Conduiting, Wiring & Power HVAC Control System.
Contractor: Mohd. Al Mojil Group Value: SR. 735,800.00
Period: 08 Months Complete % :
: 100%

The System comprised of 80 tons DX Coil System and Electrical Heater.


55: Ar Razi - III / Jubail
Contractor: Mohd. Al Mojil Group Value: SR. 2,796,060.00
Period: 12 Months Complete % :
: 100%

Electro-Mechanical Works / HVAC System (Design & Build), Conduiting, Wiring and Power HVAC Control System.

The system comprised of 160 tons DX Coil System, Bleed fan, Exhaust fan, Inertial Filter, Blast valves and Humidifier.


56: Royal Commission Schools Contract (8 Schools) At Mahallat Al-Ferdose, Al Najd, Al-Farouk and Al-Faiha Jubail
Contractor: A. A. M. Al-Khodari & Sons Co. Value: SR. 10,950,000.00
Period: 08 Months Complete % :
: 100%

- 265 Tons Girl's School - Package Roof Top A/C Units (Al-Ferdos).
- 260 Tons Boy's School - Package Roof Top A/C Units (Al-Ferdos)
- 291 Tons Boy's School - Package Roof top A/C units (Al-Najd)
- 276 Tons Boy's School - Package Roof top A/C units (Al-Farouk)
- 276 Tons Girl's School - Package Roof top A/C units (Al-Najd)
- 389 Tons Boy's School - Package Roof top A/C units (Al-Farouk)
- 389 Tons Girl's School - Package Roof top A/C units (Al-Najd)
- 389 Tons Girl's School - Package Roof top A/C units (Al-Faiha)
- 012 Tons Window A/C Units for Girl's and Boy's School.


57: General Office Complex & Associated Buildings / Dhahran.
Contractor: Al-Khodari & Sons Co. Value: SR. 6,990,000.00
Period: 10 Months Complete % : 100%
: 100%

- 220 Tons X 3=660 Tons chilled water system consisting of 25 Air Handling Units and 174 VAV's for Air-conditioning of General Office Complex Bldg. 1,2 & 3 and 150 Man Musalla.
10 TR - Package Airconditioner for Air-conditioning of 40 Man Musalla.
60 TR - Package Airconditioner for Air-conditioning of Material Receipt and Supply Office.

15 TR Package Airconditioner for Air-conditioning of MSO Access Road Office Building.
 


58: Residential Industrial Complex (RIC) Building Al-Hawtah
Contractor: Mac Value: SR. 7,125,000.00
Period: 12 Months Complete % :
: 100%

- 325 tons of Chilled water systems consists of 229 Chilled water fan - Coil units.
- 340 tons of Chilled water system consists of Chilled water AHU's.
- Communication building (40 tons DX Coil System) for computer with necessary control.


59: Wire Drawing Plant - Jubail
Contractor: Mac / Voest-Apline Value: SR. 1,200,000.00
Period: 07 Months Complete % : 100%
: 100%

The system was based on DX Coil, with a combination of single package units roof mounted and split units.


60: Saudi European Petrochemical Co.(IBN ZAHIR), MTBE II plant
Contractor: Mac / Snamprogetti Value: SR. 4,370,000.00
Period: 08 Months Complete % : 100%
: 100%

- 370 tons DX Coil System; consisting of 08 Nos Packages including pressurization Units for each system and inertial filter with bleed fan. Also included was the control system to work stand by units.
- 240 Tons chilled water system, consisting of 4 No. Chillers and 2 No. AHU and stand by blower, pressurization unit and bleed fan. Also included the automatic control system to energize the stand by units.
- Process chilled water system (25 tons capacity) to maintain a fixed temperature for the laboratory equipment with full automatic system.


Home Page | Introduction | Previous Work | Similar Project | Career | Contact Us
Copyrights © 2018 ELECTRO-MECHANICAL Co.